Issues like:
-
-
- Demo size. Total area required (m2)?
- Installation and testing period duration?
- Seawater requirement: flow and volume/day required (Pozo Izquierdo has a beach well – Atlantic water 38 g/l, SDI<2).
- Electrical grid connection required? – if yes, power required (kW) and energy consumption (kWh).
- Recovery rate, brine produced (volume and quality), brine discharge (flow (m3/h) and nominal operation daily estimation (h/day).
- Possible impacts that could generate your technology, use of chemical products in the desalination process.
- Renewable energy technology to be installed (kW, land requirement, height, etc.).
- Any other info you consider relevant for your testing.
-